43 affordable units of new housing on urban site.
Secured $400,000 photovoltaic system grant from The Boston Department of Neighborhood Development/MTC. Assisted the developer with the management of the design and installation of the system.
33.8 kW of photovoltaics; 16.72 kW dedicated to offsetting the common area electric load of the building, 17.1kW dedicated to offsetting the electric loads of 9 of the lowest income units (less than 30% AMI)