Development of 75 units of housing; 50 condominiums and 25 rental.
Secured a $570,000 solar grant from MTC/MassHousing for photovoltaic system feasibility, design, and installation. Coordinated analysis of solar thermal system feasibility.
39.65 kW of photovoltaic system to offset common area electric load; Solar thermal system to offset energy needed for domestic hot water.